Realizations

Smrock SHPP

Orzyc river

Repowering – increase in electricity production due to installation of highly efficient Kaplan turbinie

Smrock SHPP

Repowering – increase in electricity production due to installation of highly efficient Kaplan turbinie

Parameters

Diameter 800 mm
Head of 2.2 m
Power 37 kW

Technologies used

  • Kaplan Turbine
  • Active fish pass

As per framework of the cooperation with the owner of Smrock SHPP, we have conducted a turnkey investment process. We have been responsible for acquiring all necessary administrative decisions, as well as, creation of a multi-specialty design documentation for the SHPP. We have also taken part in the construction process as the general contractor and the supplier of Kaplan-equipped hydroset. Additionally, we have installed an active fish pass in the main weir to provide passability of the weir by water organisms and to allow for the utilisation of the energy of biological flow for electricity generation.

Smrock SHPP
Smrock SHPP
Scope of work

Investment planning:

  • Evaluation of available hydropower potential
  • Conceptual proposal for the utilisation of the potential
  • Financial and technical advisory

Consulting and Design:

  • Advisory to maximise the gain on the sale of generated energy
  • Support in acquiring external financing
  • Developing a complete design documentation

Execution of construction works as a general contractor:

  • Civil works coordination executed by site managers and engineers
  • Conducting operations of the construction site office, as well as managing the cooperation with the authorities and the bank
  • Manufacturing and delivery of the complete Kaplan turbine technology
  • Commissioning of the complete hydroset